Projects

Balder FPU Greenwater Protection

Design of Greenwater Protection Screens retrofit over the full length of the exposed main deck, Port and Starboard, for protection of the main deck process equipment from greenwater sea damage.

  • Client: Sir J H. Biles (Naval Services) working for Aker Maritime. Ultimate Client: ESSO Norge
  • Location: Vessel: Balder Field, North Sea Post Outfit: Greenock, Scotland
  • Category: Ship Design
Launch Project

Pembroke Dock Gate

Independent structural design check on design of dock gate followed by on-site inspection of construction.

  • Client: Babtie Group (now Jacobs), consultants to the The Milford Docks Company
  • Location: Milford Haven, UK
  • Category: Dock Gates
Launch Project

Grand Bahama Floating Dock 80,000TLC

Survey and detailed strength check for docking new generation cruise vessels, followed by design of tow arrangements for transfer from Portland, Oregon to Freeport, Grand Bahama.

  • Client: Survey: Portland, Oregon, USA Final Operation: Freeport, Grand Bahama
  • Location: Grand Bahama Shipyard
  • Category: Floating Docks
Launch Project

Pembroke Ferry Terminal

Design of additional deck to enable two tier loading of ferries using Pembroke Ferry Terminal.

  • Client: Jacobs UK Limited working for Pembroke Ferry Terminal
  • Location: Pembroke, UK
  • Category: RoRo Facillities
Launch Project

Burry Harbour Tidal Flap Gate

Strength check of a Tidal Flap Gate for impounding the Harbour at Burry Port.

  • Client: Jacobs UK (Consultants to Burry Harbour)
  • Location: Port of Burry, Wales
  • Category: Dock Gates
Launch Project

AMC-CUF Floating Dock "Yagan"

Design of 12,000TLC Floating dock for operation at the Australian Marine Complex Common User Facility. Designed to provide conventional dockings and shore transfers.

  • Client: LandCorp (Agency of the Western Australian Government) liaising through the facility managers, AMC Management (WA) Pty
  • Location: Construction: Vung Tau, Vietnam and Henderson, Western Australia Operation: AMC-CUF, Henderson, Western Australia
  • Category: Floating Docks
Launch Project

Grand Bahama Floating Dock 50,000TLC

Survey and detailed strength check for docking cruise vessels, followed by design of tow arrangements for transfer from Le Havre, France, to Freeport, Grand Bahama.

  • Client: Grand Bahama Shipyard
  • Location: Survey: Le Havre, France Final Operation: Freeport, Grand Bahama
  • Category: Floating Docks
Launch Project

Rosyth Floating Caisson Drydock Gate

Preparation of Technical Requirements, Tender Review, and Design Review.

  • Client: Jacobs UK Limited working for Babcock International, Rosyth
  • Location: Rosyth Dockyard, Scotland, UK
  • Category: Dock Gates
Launch Project

Norfolk Floating Dock 40,0000TLC

Design of dock Equipment, Outfit and Electrical systems, including blocks, ship lead in gear, dock manoeuvring system, etc

  • Client: Metro Machine Corporation Shipyard in Norfolk, Virginia, USA
  • Location: Construction: DMHI Shipyard in Mangalia, Romania Final Operation: Metro Machine Corporation Shipyard in Norfolk, Virginia, USA
  • Category: Floating Docks
Launch Project

Twelve Quays Ferry Terminal, Liverpool

Cat 3 Check on Transmarine design of the RoRo Pontoon involving structure, intact and damage stability and mooring.

  • Client: Babtie Group (now Jacobs), consultants to the Mersey Docks and Harbour Company (now Peel Ports)
  • Location: Twelve Quays Ferry Terminal, Birkenhead, UK
  • Category: RoRo Pontoon
Launch Project

8,000 TLC Floating Dock Moorings

Design of chain moorings for a Clark & Standfield designed 8,000 TLC Floating Dock (Ex Admiralty Floating Dock 58) for mooring at Lerwick, Shetland.

  • Client: Malakoff & Wm Moore, Lerwick, Scotland, UK
  • Location: Lerwick, Shetland Isles, Scotland UK
  • Category: Floating Docks
Launch Project